Sunday, March 5, 2017

5 March 2017 - The Merc

Continued with installing engine bay components ...

  • installed the radiator shroud
  • installed all coolant system hoses
  • installed water pump pulley
  • installer radiator fan
  • installed V-Belt and adjusted
  • installed intake manifold bolts(one of the carb stud holes goes into the intake runner, put some RTV on the threads and letting it cure)
  • installed mechanical water temp sensor(used RTV instead of the tape, have to let it dry for a bit)
  • set the static timing
  • filled the engine crankcase with 5 QTS oil and installed the oil filter
  • filled the transmission case with 3 quarts of oil, still need to add 5-6 more quarts - will do that later)
  • installed mechanical and electric oil pressure sending units
  •  installed nylon line for mechanical oil pressure gauge
  •  installed carb and throttle linkage
  • installed brake booster rubber vacuum line and intake manifold fitting
  • installed rubber vacuum line for transmission modulator valve
  • pressurized the oil system( using the electric drill oil pressure is 52 PSI)
  • installed ignition coil
  • installed distributor set to #1 cylinder
  • installed spark plug wires
  • connected MSD wiring to distributor and ignition coil
  • installed fuel lines
  • filled cooling system with 3 gallons of coolant(2 gals water, 1 gal coolant)
   After filling the coolant system, checked for leaks.

The Merc is now ready to start.  Charging the battery overnight.

I made this compression whistle some time ago and thought I would use it to set the timing
 
all fluids installed, timing set, waiting for battery to charge then an engine start will be attempted 6 March 2017.


Saturday, March 4, 2017

4 March 2017 - Engine/transmission installation continues...

  • install starter motor
  • install shift linkage
  • install emergency brake hardware
  • install kickdown linkage and hardware
  • install driveshaft and hardware(prep'd garage and area around car for installation)
  • install transmission hard lines
  • install radiator
  • install alternator bracket
  • install oil dispstick tube
  • install engine ground strap
  • install transmission dipstick tube
  • install headers
  • connect exhaust pipes to headers
  • install starter power cable
  • install alternator
  • install alternator wiring
  • install cooling system hoses
  • install mechanical water temp sensor
  • install mechanical oil pressure sensor and electric oil pressure sensor
  • install intake manifold vacuum port manifold( for brakes, transmission)
  • install intake manifold vacuum hard line for power brake booster
  • install rubber vacuum line from transmission modulator valve to intake manifold vacuum port
  • install carb
  • install distributor
  • install fuel line
  • install ignition coil
  • install MSD box wiring
  • install spark plug wires
  • install radiator shroud
  • set static timing
  • install water pump pulley
  • install V-belt and adjust








Wednesday, March 1, 2017

1 March 2017 - Engine/transmission installation...

  • install starter motor
  • install shift linkage
  • install emergency brake hardware
  • install kickdown linkage and hardware
  • install driveshaft and hardware(prep'd garage and area around car for installation)
  • install transmission hard lines
  • install radiator & shroud
  • install alternator bracket
  • install oil dispstick tube
  • install engine ground strap
  • install transmission dipstick tube
  • install cooling system hoses
  • install mechanical water temp sensor
  • install mechanical oil pressure sensor and electric oil pressure sensor

Monday, February 27, 2017

27 Feb 2017 - Engine/transmission Installation...

  • install starter motor
  • install shift linkage
  • install emergency brake hardware
  • install kickdown linkage and hardware
  • install driveshaft and hardware(prep'd garage and area around car for installation)
  • install transmission hard lines
  • install radiator & shroud
  • install alternator bracket
  • install oil dispstick tube
  • install engine ground strap
  • install transmission dipstick tube
  • install cooling system hoses
  • install mechanical water temp sensor
  • install mechanical oil pressure sensor and electric oil pressure sensor
  
 Moved the car so that the driveshaft can be installed.  Had to re-arrange the equipement around the car to make it easier to work on the car.

Sunday, February 26, 2017

26 Feb - 2017 - ToDo

  • install shift linkage
  • install emergency brake hardware
  • install kickdown linkage and hardware
  • install driveshaft and hardware
  • install transmission hard lines
  • install radiator & shroud
  • install alternator bracket
  • install oil dispstick tube
  • install engine ground strap
  • install transmission dipstick tube
  • install cooling system hoses
  • install mechanical water temp sensor
  • install mechanical oil pressure sensor and electric oil pressure sensor
  •   

26 Feb 2017 - Engine/transmission installation...etc

Continued with installing hardware on the engine and transmission.   Could not find some hardware for the shift linkage, still looking for that.   Went ahead and installed the export brace and shock mounts.






 

Saturday, February 25, 2017

25 Feb 2017 - ToDo

• install driveshaft and hardware
• install transmission lines
• install transmission shift linkage and hardware
• install neutral safety switch hardware
• install speedometer cable to transmission
• install transmission vacuum modulator hard line
•
•