Sunday, March 5, 2017

5 March 2017 - The Merc

Continued with installing engine bay components ...

  • installed the radiator shroud
  • installed all coolant system hoses
  • installed water pump pulley
  • installer radiator fan
  • installed V-Belt and adjusted
  • installed intake manifold bolts(one of the carb stud holes goes into the intake runner, put some RTV on the threads and letting it cure)
  • installed mechanical water temp sensor(used RTV instead of the tape, have to let it dry for a bit)
  • set the static timing
  • filled the engine crankcase with 5 QTS oil and installed the oil filter
  • filled the transmission case with 3 quarts of oil, still need to add 5-6 more quarts - will do that later)
  • installed mechanical and electric oil pressure sending units
  •  installed nylon line for mechanical oil pressure gauge
  •  installed carb and throttle linkage
  • installed brake booster rubber vacuum line and intake manifold fitting
  • installed rubber vacuum line for transmission modulator valve
  • pressurized the oil system( using the electric drill oil pressure is 52 PSI)
  • installed ignition coil
  • installed distributor set to #1 cylinder
  • installed spark plug wires
  • connected MSD wiring to distributor and ignition coil
  • installed fuel lines
  • filled cooling system with 3 gallons of coolant(2 gals water, 1 gal coolant)
   After filling the coolant system, checked for leaks.

The Merc is now ready to start.  Charging the battery overnight.

I made this compression whistle some time ago and thought I would use it to set the timing
 
all fluids installed, timing set, waiting for battery to charge then an engine start will be attempted 6 March 2017.